Saturday, September 18, 2010

Elevator cable routing preparation

This week I was able to cut the rear horizontal stabilizer to make clearance for the bottom elevator cable and glued in an extra wedge for the bolts to bolt against. we also drilled and tapped one end of the elevator push rod.
Published with Blogger-droid v1.5.9

No comments: